Rio Tinto
The control room functions 24/7/365, with operators on 12 hour shifts, performing mission critical duties with no room for error.

Location: Perth, Australia
Partner: Schiavello
Rio Tinto’s Perth Operation Centre control room houses the team responsible for transporting iron ore from mine to Port Headland. The Port and Rail Logistics (P&RL) team advocated for a control room overhaul to improve efficiency, accuracy, and productivity in their high stakes roles.
Challenge
Control room operators work long hours with intense hyper-detailed concentration. The original setup, in a tiered configuration, contributed to discomfort, noise issues, and suboptimal screen positioning. Employees requested improved ergonomics, better storage, noise reduction, and collaborative spaces.
High stakes: managing critical rail and port logistics
Long shifts: of 12+ hours each
Space constraints: for 45 control room consoles
Collaborative: design consensus across 100 team members
Mission-critical operations: with zero downtime during fitout
Operational continuity: required two-thirds of the space remain operational throughout installation


Solution
Atdec monitor arms were selected for their proven history in command and control environments worldwide. The arms integrate seamlessly with Schiavello consoles.
Multi monitor: modular solution fo any monitor layout
Precision position: of monitors by each shift operator
Fatigue reduction: via reduced neck and eye strain
High performance: Australian design for smooth operation
Professional aesthetics: sleek discrete appearance
Sit-to-stand: monitor arms with vibration resistant features
Future ready sustainable design: that is easily reconfigured or upgraded as displays and requirements change
Implementation
Atdec Modular monitor arms were seamlessly integrated into the broader transformation project, with exceptional coordination and precision.
Phased installation: during the delicate fitout process to maintain operational continuity
Custom integration: with Schiavello to ensure perfect compatibility with each custom control console
Post-installation refinement: following live environment testing, demonstrating our ongoing after-sales support ethos


The impact on other control room occupants was really important and managed exceptionally well. We've never had a contractor who has been so supportive and listened to us one hundred percent throughout the whole process.
Michele Mercer, Rio Tinto Superintendent, P&RL Projects
Atdec Modular
These are just a few of the unlimited mounting possibilities available with Atdec Modular.